Friday 17 May 2013

Roof, Plumbing, Electrical Wiring, Air-conditioning ducting, Windows and Doors.

I’ve been away on a couple of trips and have not had a chance to post an update.

A lot has happened in the past 3 weeks.

Plumbing was started on Saturday 04/05/2013.

WP_20130505_029

Roofing was done in the week starting 06/05/2013. The roof colour is the same as the fascia and guttering i.e. colorbond surfmist. We chose a modern sloping surface (skillion) for our roof. The reason for going all surfmist for the colour is three-fold 1. helps to blend the roof into the environment, 2. better energy rating and 3. adds a modern element.

WP_20130508_019

WP_20130508_020

WP_20130506_027

WP_20130508_021

Windows, stacker and bi-fold doors were also installed during the same week.

Bedroom 5, which will probably be used for either a home gym or guest bedroom – as there is an ensuite bathroom (not referring to the portaloo in the reflection) front window. This window will have brick and render around it as a feature of the facade.

WP_20130508_005

Bedroom 5 side window.

WP_20130508_006

Media room.

WP_20130508_007

WP_20130508_012

Dining room stacker door.

WP_20130508_008

Alfresco stacker door.

WP_20130508_009

Family room bi-fold door.

WP_20130508_010

Kitchen

WP_20130508_011

WP_20130508_016

Laundry room sliding door.

WP_20130508_013

Powder room/Ensuite 2.

WP_20130508_014

Pantry window with built-in ventilation.

WP_20130508_015

Master bedroom windows.

WP_20130509_005

WP_20130509_016

Staircase

WP_20130509_007

Study

WP_20130509_008

Bedroom 3

WP_20130509_010(1)

Bathroom

WP_20130509_013

Air-conditioning ducting.

WP_20130509_014