We had a nice surprise on Friday (24/05/2013). The carpenters were back on site to install more weatherboard!
The solar hot water guys also installed their panels on Friday…a particularly overcast day – lolz. I believe it will be a, ’pump-circulated’ system, with the storage tank being ground-mounted (close to our laundry) and below the level of the collectors; a circulating pump moves water (or heat transfer fluid) between the tank and the collectors.
The entire house now has drywall installed as well.
Media room with bulkhead.
Hallway to front door.
Kitchen, pantry, fridge space, etc.
Dining room.
The roof was also fixed on Friday, as can be seen in the photo below. The suspense of waiting to see if our colour scheme works has become unbearable difficult to ignore…so, on Sunday we painted a piece of discarded scyon. The colour is half shale grey. We think it goes nicely with the surfmist.
It should work with the anodic natural matt window and door frames as well.
No comments:
Post a Comment