Tuesday 28 May 2013

Cornices

The cornices were installed in the week starting 27/05/2013. Cannot believe dusty, regular, stock-standard, unpainted, cove cornices manages to bring about some excitement…pretty sure we will look at this blog in time to come thinking ‘man we needed a life back then’ – but that is just the house building process I guess, all-attention-consuming for an extended period.

WP_20130528_006

WP_20130528_005

WP_20130528_003

Sunday 26 May 2013

Electrical

We got our light fittings at Beacon lighting (where the block shops :)) on Sunday (26/05/2013). We won’t need them for another month, but we wanted to make use of the winter sale (30% off a second light).

The main choices are below:

Staircase.

image

Kitchen pendants.

image

Living areas (family, dining, media and kids zone)

image

image

Bedrooms. Altitude Eco 122cm LED in white.

image

Up/Down Lights. Garage and either side of Bi-fold door.

image

Either side of dining room stacker door and in key areas around house, including in laundry area (with a sensor eye).

Saturday 25 May 2013

External Progress, Weatherboard Colour and Drywall

We had a nice surprise on Friday (24/05/2013). The carpenters were back on site to install more weatherboard!

WP_20130524_009

WP_20130524_010

The solar hot water guys also installed their panels on Friday…a particularly overcast day – lolz. I believe it will be a, ’pump-circulated’ system, with the storage tank being ground-mounted (close to our laundry) and below the level of the collectors; a circulating pump moves water (or heat transfer fluid) between the tank and the collectors.

WP_20130524_015

The entire house now has drywall installed as well.

Media room with bulkhead.

WP_20130524_006

Hallway to front door.

WP_20130524_005

Kitchen, pantry, fridge space, etc.

WP_20130524_004

Dining room.

WP_20130524_003

The roof was also fixed on Friday, as can be seen in the photo below. The suspense of waiting to see if our colour scheme works has become unbearable difficult to ignore…so, on Sunday we painted a piece of discarded scyon. The colour is half shale grey. We think it goes nicely with the surfmist.

WP_20130526_001

It should work with the anodic natural matt window and door frames as well.

image

Wednesday 22 May 2013

More Drywall and Electrical

Exterior progress has come to a halt as the carpenter crew had to start a new house this week. The scaffolding has been up for the last week or so. We’re hoping that this does not affect the total length of time that we need the scaffolding for as it is a provisional item in our contract.

cross fingers

Some internal progress has been made though.

WP_20130521_004

WP_20130521_002

We’re hoping that this issue with the roof will be fixed before we get too much rain.

WP_20130522_001

Electrical

We’re in the process of finalising our electrical fittings. We have some down lights in the contract and a provisional item for ceiling fans (which also needs to include the fittings for the down lights – this was a misunderstanding on my part, I assumed that down lights in the contract would include the wire and the fitting. The impact of this is that we’re a little more restricted in the budget that we anticipated to be available for extra pendants, step lights, etc.).

We’re working with the electrician to add the following items:

Product Name

 

 

 

clip_image001

Alert II 1 Light Floodlight with Sensor in Brushed Aluminium

 

 

clip_image003

Alert II 2 Light Floodlight with Sensor in Brushed Aluminium

 

 

clip_image004

Lucci Marine 1 Light Adjustable Wall Bracket in Marine Grade Stainless Steel

 

 

clip_image005

Hellar 250mm Square Exhaust Fan With Light In Silver

 

 

clip_image006

Maxx 20W Step Light Kit in Silver

 

 

clip_image007

Triangle 12V Downlight In Brushed Chrome

 

 

clip_image008

Habitat 600mm Pendant in Brown/Black

 

 

clip_image009

Lucci Marine Exterior Up/ Down Wall Bracket in Marine Grade Stainless Steel

 

 

clip_image010

Tadao 1 Flat Top Pendant in Concrete

 

 

clip_image011

Horizo II 1 Light 14W Mirror Light In Silver With Frost Glass

 

 

clip_image012

Project 1 Light 36W Fluorescent Bare Batten In White

 

 

clip_image013

Project 1 Light 18W Fluorescent With Clear Prismatic Diffuser In White

 

 

Monday 20 May 2013

Drywall and more Weatherboard

Drywall installation started on 20/05/2013.

Family

WP_20130520_001

Dining

WP_20130520_015

WP_20130520_003

WP_20130520_004

Hallway

WP_20130520_006

Store room/Media Hub

WP_20130520_007

Bedroom 5

WP_20130520_008

WP_20130520_009

Saturday 18 May 2013

Weatherboard, Brickwork, Eaves and Insulation

The brickwork started on 10/05/2013, some of the cladding, eaves and insulation was installed during the week starting 13/05/2013.

WP_20130510_003(1)

James Hardie Scyon Linea weatherboard being installed.

 WP_20130510_005(1)

WP_20130510_011(1)

WP_20130510_014(1)

Linea around dining room stacker door.

WP_20130515_004

Alfresco ceiling and eaves.

WP_20130516_001

WP_20130516_002

Eaves around the skillion roof.

WP_20130516_003

Eaves.

WP_20130516_005

WP_20130516_007

Wall insulation was installed on 17/05/2013. Dining and family.

WP_20130517_001

Media

WP_20130517_002

More linea on 17/05/2013. Alfresco area.

WP_20130517_003

Have to love the weather in Queensland.

WP_20130517_005

WP_20130517_007

We went to the outdoor living and landscape expo on 18/05/2013 to get some ideas for finishing the steps to our backyard (and potentially pool) area. We managed to line up a few quotes which will be done in the next couple of weeks.

Our neighbour on the one side signed a fence (on top of retaining wall) height relaxation on 18/05/2013. That is really great news for us as it saves us time and money in not having to get the council to assess the requirement for the fence.

More linea on Saturday 18/05/2013.

WP_20130518_026

WP_20130518_028