Monday 10 June 2013

Two Stages (Part 1)

I’ve been away for the last 2 weeks, and hence have not updated the blog. Two more stages in the build process were completed in this time i.e the ‘Exterior Cladding’ and ‘Plasterboard and Internal Stairs’ stages.

Facade, the horizontal weatherboard is Scyon Linea. The vertical weatherboard is Axon. The bricks will be rendered.

WP_20130531_002

All gutters have been installed and connected to the drainage pipes that flow to the rubble pit in the backyard.

WP_20130531_003

WP_20130603_016

Staircase being installed on 01/06/2013.

WP_20130601_006

WP_20130601_007

WP_20130603_011

WP_20130603_012

Internal step.

WP_20130603_001

Garage door was also installed on 01/06/2013.

WP_20130602_001

WP_20130602_003

We checked for leaks and the stormwater solution during some of the rain days over the last couple of weeks. All seems to be working fairly well.

WP_20130602_005

This downpipe will probably be hooked up when the scaffolding comes down (scheduled for 11/06/2013).

WP_20130602_006

This downpipe will be connected to a 5000 litre water tank.

WP_20130602_013