Sunday 30 June 2013

Lights, Alarm, Carpets, etc

The alarm was installed on Friday 28 June 2013.

Most of our lights were installed on Saturday 29 June 2013. We’re going relatively green with mostly LED and ECO friendly choices.

LED fan in Katie’s bedroom, looking towards the kids zone. The fan is probably a little too low, but that can be adjusted later.

WP_20130629_002

LED downlight. The beam angle on these downlights are not fantastic – we’re hoping they will work out as they were a last minute replacement (from our rapidly disappearing contingency budget!) for the builders range downlights.

WP_20130629_003

Builders range downlight.

WP_20130627_006

Kids zone

WP_20130629_001

Family

WP_20130629_014

Family and dining

WP_20130629_018

Media

WP_20130629_024

Kitchen pendants (2/3 installed when the photo was taken)

WP_20130629_025

WP_20130629_026

Photo taken through the stacker door (as we don’t have access to the house when the tradies are not around :().

WP_20130630_002

We think our kitchen will be pretty close to the kitchen that we roughly based ours on i.e. this one.

We ordered our carpets! Tick – another big item is off the looooong list. After a lengthy research period (25 minutes), we decided on the Cosy Comfort SmartStrand Silk range, narrowed down to two colours Riverstone (darker sample in the photo below) and Crystal Stream.
(PS. They’re not blue at all – funny how colours can show up completely different on computer monitors.)

WP_20130628_012

WP_20130629_008

We went with Crystal Stream (on the right in the above photo), with a Cloud 9 underlay. Installation is booked for 22 July 2013.

Water tank.

WP_20130625_001

WP_20130630_005

Solar water

WP_20130628_011

Solar power was also connected in the last week.

WP_20130628_010

Retaining wall drainage is now linked to the site drainage. These pipes will be covered with soil.