Wednesday, 11 September 2013

Landscaping I

It’s been a crazy time since we took handover of the house. Building the house now seems like the easy part!

We seriously underestimated the amount of landscaping that would be required. Our block is 800sqm and we have to find something to do with the remaining ~550sqm. An absolute legion of earthwork crews have totally decimated the hard work that previous owners have put into the land over the past 60 or so years.

We set off to prioritise the many projects that would be required and ended up with the following list (to start with):

  1. Construct backyard fence, with 1m high retaining wall to reduce slope in backyard
  2. Construct concrete steps to access backyard and finish retaining wall
  3. Construct retaining wall fence and a gate for pool and general safety
    (Reason: retaining walls up to 2m in height, pool regulations)
  4. Swimming Pool
    (Reason: only access to backyard via neighbours driveway will not be available for much longer)
  5. Turf the backyard
  6. Piers for 60sqm deck
    (Reason: machinery access will be problematic once we have a driveway)
  7. Front boundary fence and retaining walls
    (Reason: security and should be done before driveway)
  8. Driveway
    (Reason: we’re on a slope that’s slippery at the best of times and with the rainy season fast approaching access into our house will become an issue)
  9. Fence side boundary

Project 1

<whinge>We’ve had dealings with two landscapers and both were very difficult to work with and produced substandard work for a small fortune. First landscaping lesson learnt, don’t use landscapers. They tend to try their hands at everything and aren’t really master of anything in particular. Disclaimer: There’s a chance that we were really unfortunate with the landscapers we ended up with. Regardless, in future I’ll DIY or get specialists in to do bits and pieces.</whinge>

Decommissioning of chain wire fence in backyard.

WP_20130816_001

New timber paling fence going up.

WP_20130819_003

WP_20130820_002

WP_20130821_004

Trench for the pool wiring.

WP_20130816_002

Back retaining wall with increased height drainage pits and extra soil being put into the site.

WP_20130917_003

Project 2

Form work for concrete steps.

WP_20130819_004

Matching coloured concrete for steps with the pool tiles and driveway.

WP_20130821_005

Project 3

Side fence on top of retaining wall.

image

Steps, and pool fence going up. DW pretending to be doing the work! JKS

WP_20130922_003

Thursday, 18 July 2013

Sunday, 30 June 2013

Lights, Alarm, Carpets, etc

The alarm was installed on Friday 28 June 2013.

Most of our lights were installed on Saturday 29 June 2013. We’re going relatively green with mostly LED and ECO friendly choices.

LED fan in Katie’s bedroom, looking towards the kids zone. The fan is probably a little too low, but that can be adjusted later.

WP_20130629_002

LED downlight. The beam angle on these downlights are not fantastic – we’re hoping they will work out as they were a last minute replacement (from our rapidly disappearing contingency budget!) for the builders range downlights.

WP_20130629_003

Builders range downlight.

WP_20130627_006

Kids zone

WP_20130629_001

Family

WP_20130629_014

Family and dining

WP_20130629_018

Media

WP_20130629_024

Kitchen pendants (2/3 installed when the photo was taken)

WP_20130629_025

WP_20130629_026

Photo taken through the stacker door (as we don’t have access to the house when the tradies are not around :().

WP_20130630_002

We think our kitchen will be pretty close to the kitchen that we roughly based ours on i.e. this one.

We ordered our carpets! Tick – another big item is off the looooong list. After a lengthy research period (25 minutes), we decided on the Cosy Comfort SmartStrand Silk range, narrowed down to two colours Riverstone (darker sample in the photo below) and Crystal Stream.
(PS. They’re not blue at all – funny how colours can show up completely different on computer monitors.)

WP_20130628_012

WP_20130629_008

We went with Crystal Stream (on the right in the above photo), with a Cloud 9 underlay. Installation is booked for 22 July 2013.

Water tank.

WP_20130625_001

WP_20130630_005

Solar water

WP_20130628_011

Solar power was also connected in the last week.

WP_20130628_010

Retaining wall drainage is now linked to the site drainage. These pipes will be covered with soil.

WP_20130628_006

Saturday, 22 June 2013

Paint and Bench Tops

We chose to change our bench tops from Essastone Piazza to Essastone Carbon due to the Piazza not being available in the country. We would have had to wait 5 weeks for the Piazza.

We also changed our paint colour from a Resene ‘bon jour’ like custom mix to Dulux White Duck Quarter.

Niche cabinet

WP_20130622_027

Family room

WP_20130622_024

Dining room window

WP_20130622_023

Dining room niche

WP_20130622_021

Kitchen

WP_20130619_006

WP_20130622_020

Hallway to front door.

WP_20130622_019

Media room

WP_20130622_013

Garage shelves

WP_20130622_011

Powder room

WP_20130622_010

Bedroom 5

WP_20130622_009

Looking towards the family room.

WP_20130622_008

Friday, 14 June 2013

We have electricity (and Tiles)!

The panels for solar electricity were installed on Friday (14/06/2013). It’s a good thing we were onsite as the contractor had no idea where his colleague put the wiring (which was installed during the frame stage)!

WP_20130614_019

After netball on Saturday (15/06/2013), we noticed that our electricity was connected. The builder used power from our neighbour to get to this point in the build. Thanks Allan!

WP_20130615_001

In the past week, the tiles were laid, scaffolding was removed, the painter polly filled the internal walls, trim and shelves. A plaster tradie was also around to fix the cornices in the media room and around the staircase. It is rather funny how the tradies all have their radios on at the same time – and all tuned to different stations. :)

WP_20130611_013

WP_20130612_004

Cool lazers being used, rather difficult to get the lines wrong, or not?

The kitchen guy was there on Saturday to correct the kickboards and ‘fix’ the pantry shelving. We are not very happy with the standard of the pantry, it’s basically just a bunch of free standing shelves – not exactly what one would expect in a butlers pantry. We will talk to the builder about this but we’ll probably have to add it to the rather long list of things that we’ll need to resolve afterwards.

WP_20130615_003

WP_20130616_001

We think our white cabinets looked a bit average without the brushed aluminium kickboards.

WP_20130611_002

Render was also applied to the garage and feature window on the facade.

WP_20130614_014

WP_20130614_010

WP_20130614_001

We’re considering the ‘CHERT’ carpet from Carpet Call.

WP_20130611_010

WP_20130611_011